Granule loss and curling observed on South-facing slope. Approximately 30% of shingles show signs of deterioration indicating they are nearing the end of their useful life. Estimated remaining life: 3-5 years.
Recommendation: Budget for roof replacement within the next 3-5 years. Obtain estimates from licensed roofing contractors for full tear-off and replacement.
Kickout flashing missing at roof-wall intersection on the east side. This can lead to significant water intrusion behind the siding and potential structural damage over time.
Recommendation: Install kickout flashing at all roof-wall intersections per IRC R903.2.1. Have a qualified roofer address this before the next rainy season.
Gutters and downspouts are in serviceable condition. Proper drainage observed at all downspout terminations.
Paint peeling on north-facing trim boards and window casings. No wood rot detected at this time, but exposed wood is vulnerable to moisture damage if not addressed.
Recommendation: Scrape, prime, and repaint all exposed wood trim within the next 6 months to prevent moisture intrusion and wood rot.
Positive drainage observed away from foundation on all sides. No signs of ponding or improper grading.
Concrete driveway and walkways are in serviceable condition with minor cosmetic cracking. No trip hazards identified.
Two neutral wires connected to a single terminal bar lug (double-tapped neutral). This is a code violation and potential fire hazard per NEC 408.41.
Recommendation: Have a licensed electrician separate the double-tapped neutrals. Each neutral conductor must terminate on its own terminal. This is a safety concern that should be addressed promptly.
GFCI protection present and functional at all required locations: kitchen, bathrooms, garage, and exterior outlets. All tested and tripped/reset properly.
Smoke detectors present in all bedrooms and hallways. CO detector present near sleeping areas. All units tested and functional.
Furnace filter is heavily clogged with debris. Carrier model, manufactured 2018 (7 years old). Unit fired and operated normally during testing, but restricted airflow reduces efficiency and can damage the blower motor.
Recommendation: Replace the furnace filter immediately and establish a regular replacement schedule (every 1-3 months depending on filter type). Consider a professional HVAC tune-up.
A/C unit tested and cooling normally. Temperature differential of 18°F measured across the supply and return, within acceptable range (15-22°F).
Electric water heater (AO Smith, 50 gal, manufactured 2020). No visible leaks or corrosion. TPR valve and discharge pipe present and properly routed.
Copper supply lines in good condition. Adequate water pressure measured at 55 PSI (acceptable range: 40-80 PSI). No active leaks observed.
Double-pane vinyl windows throughout. All windows tested operated smoothly with intact seals. Exterior doors close and latch properly.
No significant cracks, stains, or evidence of moisture damage observed on interior surfaces. Floors are level with no noticeable deflection.
Report generated by RepoDeck
RepoDeck combines AI-powered narratives, photo analysis, and professional formatting — so you spend less time writing and more time inspecting.